This takt time calculator divides available production time by customer demand: 450 minutes for 900 parts is a takt of 30 seconds, so every station has to cycle within 30 s.
- Takt time
- – s
- Bottleneck cycle
- – s
- Total work content
- – s
- Fewest stations at takt
- –
- Line balance efficiency
- – %
- Parts per shift at the bottleneck
- –
Every station is within takt: the line can meet demand.The bottleneck is slower than takt: the line cannot meet demand as balanced.
Enter a shift longer than its breaks, a demand above zero and cycle times above zero.
How it works
How is takt time calculated?
Takt time = available production time ÷ customer demand. 450 minutes for 900 parts gives 30 seconds: one part every 30 s.
The slowest station sets the line’s pace. If it is slower than takt, the line cannot meet demand without overtime or rebalancing.
The fewest stations at takt = total work content ÷ takt, rounded up. Balance efficiency = total work ÷ (stations × bottleneck cycle): how evenly the work is spread.
In Hermetry Hermetry collects run state, cycle time and good and reject counters from machine PLCs: Production tracking with machine counters.
Glossary MES (manufacturing execution system), OEE (overall equipment effectiveness)
Questions
Questions about the takt time calculator
What is the difference between takt time and cycle time?
Takt time is the pace demand asks for; cycle time is the pace a station actually achieves. A station must cycle within takt for the line to keep up.
Should I plan stations at exactly takt?
Usually below it: stops, changeovers and variation eat into the time. Many lines plan at 85 to 95 % of takt.