Replied to A paper mill SCADA board: machine speed, production and moisture per site
Makes sense. A badge would be enough for our shift.
-
Replied to A paper mill SCADA board: machine speed, production and moisture per site
Three sites have an offline warning but the table still says RUNNING, with a speed. Which do I believe?
-
Replied to 2.2.2: devices behind a gateway send data and take commands through it
How many children can one gateway carry? We have a line with roughly 300 Modbus slaves on two gateways.
-
Replied to How can a 150 dollar indoor LoRaWAN gateway listen to so many sensors at once?
Good to know about the metal racking, I'll budget a second one for the cold store then.
-
Replied to How can a 150 dollar indoor LoRaWAN gateway listen to so many sensors at once?
Also curious from the money side. If one 150 dollar box covers our warehouse, that changes the business case a lot compared to the…
-
Replied to Steel plant board: eight sites in a table and on a map, open alarms below
Ankara says RUNNING in the table but also has an "is offline" alarm open for 3 days. If I'm the operator, which one do…
-
Carlos is right about SMS. I run a food plant and we built nearly the same "only at night, only if it lasts" alert…
-
Replied to Why are the ultra low power MCUs all 32-bit? I assumed 8-bit would sip less
Good. Fewer transmits means fewer site visits, I'll take it.