New: the AI firewall watches the whole platform and explains each incident in plain words. See how it works

Reply To: A small water network in the process-diagram editor, boreholes to water tower

In this sample the reservoir branch takes off before the PRV, so the reservoir gets the pumps’ pressure. The PRV lowers the pressure for everything after it, which in the drawing includes the tower branch and the hydrant. But it is a demo layout I drew to show the symbols, not a hydraulic design, so please do not take it as how a network should be built.

♥ 0