Building energy monitoring can start with the meters a building already has: the main meter and any sub-meters on floors, tenants or plant. Their energy counters (kWh) give consumption per hour and day, and their power readings (kW) show demand. Together they show the base load, use outside opening hours, and which system uses what.
New sensors can wait. I would start with what is already counting inside the meters on the main board and the floor distribution boards.
How do you read an energy meter over Modbus?
You poll its registers. An electronic meter with a Modbus port, serial or Ethernet, holds its readings in registers, and the Modbus application protocol defines each register as a 16-bit word, so a total energy value usually spans two registers or more.
The specification leaves the mapping to the device maker, so the meter’s own register map tells you where total energy, power, voltage and current sit, and in which word order (more on Modbus register addressing). A meter without a data port often has a pulse output instead, where each pulse stands for a fixed amount of energy. For energy, read the cumulative total, not the meter’s own interval figures: a missed poll then loses resolution, not consumption.
What is the difference between kW and kWh on an energy dashboard?
Kilowatts (kW) are power, the rate of use at one moment; kilowatt-hours (kWh) are energy, power over time. A 10 kW load running for three hours uses 30 kWh.
They belong on different charts. Consumption is an amount per period, so I show kWh as bars per hour or per day; demand moves continuously, so kW goes on a line. An average of a kWh counter means nothing; what you want is how much it rose in each period, the difference between consecutive readings. Keep the two units off one axis.
Hermetry connects field devices to live dashboards, rules and alerts: IoT telemetry and SCADA in one platform. Its chart cards have an increase aggregate for counters such as kWh: each hourly or daily bar shows how much the counter rose in that bucket, and a counter that restarts is counted from zero. Each source can also read the period just before, so a second card shows last week beside this week. Daily rollups run midnight to midnight UTC, so for local days in another time zone you add up the hourly buckets.
How do you find base load in a building?
Base load is the demand that remains when the building is empty. Look at the lowest steady kW on several nights and a weekend, not one reading, since a single dip can be a meter glitch or a power cut.
A base load of 40 kW is 40 × 168 = 6,720 kWh a week, and in a building occupied 50 hours a week it runs alone for the other 118. Sub-meters show which system holds it: ventilation on the wrong schedule shows on the plant meter, lights left on show on the lighting circuits. Each kW you take off the base load saves 168 kWh every week.
How do you compare energy use week to week?
Compare like with like: the same days of the week, holidays marked, and heating or cooling adjusted for the weather. A mild week and a cold week are not a fair pair.
Degree days handle the weather. The US Energy Information Administration computes them by comparing a day’s mean outdoor temperature with a base of 65 °F; dividing a week’s heating energy by its heating degree days gives a figure you can compare across mild and cold weeks. For a full point list and rollout across many sites, see automatic energy meter reading across many sites and the buildings industry page.
Frequently asked questions
How often should energy meters be read for building monitoring?
Often enough to see the shape of a day. Reading the cumulative kWh counter every few minutes gives clean hourly bars and a usable night-time minimum; power in kW needs the same rate or faster if you care about short peaks. Because the counter accumulates, a missed reading costs detail, not energy.
Do I need a sub-meter on every circuit?
No. Start with the main meter and one sub-meter per large system or tenant, such as heating and cooling plant, lighting, and server rooms. Add more only where the base load or a tenant split cannot be explained with what you have.
Why does the meter total not match the sum of the sub-meters?
Because the sub-meters may not cover every circuit, and each meter has its own accuracy. The gap between the main meter and the sum of the sub-meters is the unmetered load plus measurement error; watch it as its own series, since a sudden change in the gap points at a new load or a failed sub-meter.