That’s the answer I needed. Safety interlocks stay in the PLCs where they already are, Edge buffers the meters, and the cloud does the reporting and alarms. I asked the integrator for the buffer size of their model, they came back with roughly two days at our polling rate, which is plenty. Finance is satisfied because the box is replacing a Pi we would have had to look after ourselves.