Nouveau : le pare-feu IA surveille toute la plateforme et explique chaque incident en termes simples. Découvrez comment ça marche

Sample time for a heating loop with a known outdoor-temperature disturbance, and why not close it in the cloud

Sample time for a heating loop with a known outdoor-temperature disturbance, and why not close it in the cloud

0 1

Mix of coursework and my internship, so I’d like the why as well as the what.

A district heating substation: a PI loop drives a 3-way valve to hold the secondary supply temperature. Outdoor temperature is the main disturbance and we measure it, so I want to add feed-forward. Two questions:

1. How do I pick the loop’s execution interval (Δt) when I know the disturbance? My notes say « fast enough compared with the disturbance » which isn’t a number.

2. My mentor half-jokingly suggested doing the control in Hermetry with a Rules card, since the readings are there anyway. Is that a terrible idea or just a bad one?

Timestamps in UTC or it didn't happen.
♥ 0
Affichage de 1 message (sur 1 au total)
  • Vous devez être connecté pour répondre à ce sujet.

Rejoignez la discussion

Connectez-vous pour poser et répondre à des questions, aimer les messages utiles et marquer la réponse qui a résolu votre problème. Chaque contribution rapporte des points et des niveaux.

Partager