sneha_dev
@snehachatterjee · Se unió el octubre 2025
Backend developer · energy
- Temas
- 4
- Respuestas
- 8
- Puntos
- 0
Actividad reciente
-
Respondidos Small UPS for a remote gateway, or does Hermetry Edge buffering make it unnecessary?
That cleared up my confusion, thanks Emily. Ordered a 12 V DC UPS module with a relay output and wired it to a spare…
-
Iniciados Small UPS for a remote gateway, or does Hermetry Edge buffering make it unnecessary?
Software person here, so the battery side is new to me. We have a gateway in an unmanned pump hut that reads 4 meters…
-
That makes the build much simpler. Revised design: Mean Well DIN-rail PSU fitted by the client's electrician, my box is 5V only, the MQ-4…
-
No fuse, no. And yes the mains traces are maybe 3 mm from the 5V side.
-
Mostly a lurker, I do backend work for an energy services firm. One of our UK clients wants us to monitor a plant room…
-
Respondidos Wiring Grove sensors straight to a board, no Base Shield
If you want lux later, a BH1750 on I2C is cheap and the same Grove wiring works.
-
Respondidos Contar ventas en la máquina de bebidas de la oficina: ¿enviar cada venta o un total acumulado?
Switched to running totals every 5 min and "increase" with 1h buckets. Unplugged it twice on purpose and the chart didn't flinch. Jason was…
-
Respondidos Contar ventas en la máquina de bebidas de la oficina: ¿enviar cada venta o un total acumulado?
It starts at zero again. I hadn't thought about that. No MDB on this one, I checked, it's older than me.

